0-60 Degree Solar Panel Roof Mounting Systems 275w 285w Portrait Landscape Aluminum Alloy
Contact Person : Zhang
Minimum Order Quantity : | 5 Set/Sets | Price : | US $50-80 / Sets |
---|---|---|---|
Packaging Details : | 1.Carton box,wooden pallet,belt bundle packing and other kinds of package ensure the products safty and waterproof. 2.Customized packing | Delivery Time : | within 15-25 work days after receipt deposit |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 50000 Set/Sets per Month |
Place of Origin: | CHINA | Brand Name: | TIANFON |
---|---|---|---|
Certification: | SGS,ISO 900,ISO 14001,OHSAS 18001 | Model Number: | Solar Panel Roof Mounting Systems |
Detail Information |
|||
Specification: | As Required | Engineering Service: | Acceptable |
---|---|---|---|
Material: | Galvanized Steel,Aluminum Alloy | Tilt Angle: | 10/15/20/30/ Customized |
Surface Treatment: | Galvanized,Anodized | Application: | Industrial,Commercial,Home,Residential, Utility-scale,Solar Mounting System |
Duration: | More Than 20 Years |
Product Description
Portrait / Landscape Galvanized Photovoltaic Mounting Brackets For Residential Industrial Solar Panel Rooftop Systems
The Solar Mounting structure is used to fix the solar PV panels and gives a support and inclination to the system. All materials of solar panel roof mounting system can be 100% recycled, and no waste is generated, which fully embodies the concept of energy saving and environmental protection of the solar photovoltaic power generating system.
Specification:
Types | Roof solar mounting |
Color | Natural or Customized |
Treatment | Anodized, Galvanized |
Structural materials | Aluminum Alloy, Hot-Galvanized Steel, Stainless Steel |
Ground Clearance | ≥ 0.15m |
Install Angle | 0-60 degree |
Module Orientation | Portrait, landscape |
Wind load | 130mph(60m/s) |
Snow Load | 30psf(1.4kN/m2) |
Applicable Module | Framed, frameless |
Array Layout | According to the actual situation |
Warranty | 10 years |
Duration | More than 20 years |
Benefits:
► High competitiveness in materials cost
► Fast and easy installation on the roof directly or pre-made cement blocks
► Extraordinarily environment-friendly performance
► 100% lightweight and corrosion resistant aluminum rails
► Flexible to meet any solar panels
Project Case:
Roof Solar Power Generation Project 4.22MW
Located in Hangzhou Zhejiang Province
Packaging & Delivery:
► Package: strong and long distance transportation package
► Delivery Detail: Delivery time:7--25 days after receiving customer’s deposits
► Place of loading: Basic Seaport, China
► Payment Terms: L/C,D/A,D/P,T/T
Certificates:
Enter Your Message